[ 04 / DIRECT COMMUNICATIONS · DEPLOYMENT DESK ]
CONTACT & OPERATIONS.
[ DIRECT DISPATCH & FACTORY ACCESS ]
Direct commissioning inquiries, drilling rig quotations, spare assemblies, and on-site technical support for heavy hydraulic equipment.
RESPONSE TURNAROUND
< 24 HOURS
CAD QUOTATION & TIME ESTIMATE
[ 04.1 / COMMISSIONING SPECIFICATION FORM ]
REQUEST RIG SPECIFICATION & QUOTATION.
Transmit your geological depth requirements, compressor CFM targets, and carrier truck preferences. Our engineering team calculates hydraulic payload and prepares an itemized factory proposal.
[ FACILITY HEADQUARTERS ]
KUNNATHUR WORKS
Periyasamy Hydraulic Equipments
SF No. 248/1, PN Road, Kunnathur
Tiruppur District, Tamil Nadu 638103, India
SF No. 248/1, PN Road, Kunnathur
Tiruppur District, Tamil Nadu 638103, India
DIRECT PHONES
ELECTRONIC DISPATCH
[ WORKS DISPATCH LOAD ]
WORKSHOP CAPACITY & HOURS
08:30 IST
13:00 IST
19:00 IST
ACTIVE FABRICATION SHIFT
MON – SAT: 08:30 – 19:00 IST
Call Plant
[ COMMISSIONING PROTOCOL ]
FOUR DEPLOYMENT STAGES
01
GEOLOGICAL REVIEW & SIZING
Borehole depth, torque requirement, and carrier axle distribution calculated.
02
CAD & HYDRAULIC SCHEMATIC
Itemized manufacturing quotation covering mast channels, pumps, and delivery timeline.
03
FABRICATION & TESTBENCH
Box mast welding, CNC cylinder boring, and 350-bar hydrostatic pressure certification.
04
COMMISSIONING & FIELD TRIAL
On-site drilling handover, operator safety orientation, and 1-year factory warranty.
[ 04.2 / GEOGRAPHIC POSITION & TRANSIT HUBS ]
KUNNATHUR WORKS LOCATION.
LAT 11.1085° N // LON 77.4119° E · TIRUPPUR DISTRICT
PLANT ACCESS
SF NO. 248/1, PN ROAD, KUNNATHUR
Direct heavy vehicle transit from Coimbatore International Airport & Erode Junction via Salem-Kochi Highway (NH 544).
Navigate on Google Maps →COIMBATORE INTERNATIONAL AIRPORT (CJB)
58 KM
APPROX. 1 HR 15 MIN TRANSIT VIA NH 544
TIRUPPUR RAILWAY JUNCTION (TUP)
28 KM
APPROX. 40 MIN HEAVY LOGISTICS ARTERY
NATIONAL HIGHWAY 544 ACCESS
12 KM
VIJAYAMANGALAM CORRIDOR CONNECTOR
[ VISIT OUR KUNNATHUR WORKS ]
INSPECT COMPLETED RIGS ON THE FACTORY FLOOR.
Factory visits welcome by appointment. Witness robotic welding, mast stress trials, and high-pressure hydraulic tests before final deployment.